A.  PACKAGE "A" -- For Towers mounted on Hinge Base "T" (Threaded Adjustable version w/ templates)​

        1.  Installation Instructions 2010-Threaded Leg Base PDF.pdf​​

        2.  Installation HB w Templates 2013 PDF.pdf

        3.  Installation HB w Templates 2013 A PDF-1.pdf

        4.  Installation HB w Templates 2013 B PDF.pdf

        5.  Grounding May 2006 PDF.pdf

TOWER INSTALLATION INSTRUCTION PACKAGES

Below is a list of our different tower packages.  Click on your package type to view the installation instructions in PDF format.

B.  PACKAGE "B" -- For Towers mounted on Hinge Base "J" (non-adjustable plum)​

        1.  Installation Instructions 2010--Rebar Leg HB-J.pdf

        2.  Footing HB Type.pdf

        3.  If you have an "Old Style" Tower

             A.  Installation of Foundation Schematic.pdf

             B.  Bolt Configuration Schematic.pdf

             C.  Grounding Rod Schematic.pdf

        4.  Grounding May 2006 PDF.pdf

F.  PACKAGE "F" -- For Towers with Hinge Flat Mounts (for two threaded rods per leg only)

        1.  Installation Instructions 2010-Threaded 2X Leg Base.pdf

        2.  Installation FHB 2 thrd rod legs w Templates 2007 Model (1).pdf

   

C.  PACKAGE "C" -- For Towers w/ Stands & Fold Over Kits at ground level 

        1.  Installation Instructions 2010-Threaded Leg Base w FOK PDF.pdf

        2.  Installation HB w Templates 2013 PDF.pdf

        3.  Installation HB w Templates 2013 A PDF-1.pdf

        4.  Installation HB w Templates 2013 B PDF.pdf

        5.  Installation of Screw Actuator, 1 bearing PDF.pdf

        6.  Gearmotor Mounting Instructions A PDF.pdf

        7.  Screw Actuator w Gearmotor 2015.pdf

        8.  Grounding May 2006 PDF.pdf

             

D.  PACKAGE "D" -- For Towers mounted on Hinge Base "T" w/ FOK at the 8 ft. level

  1. If NEW tower, USE:

        a.  Installation Instructions 2010-Threaded Leg Base PDF.pdf

        b.  Installation HB w Templates 2013 PDF.pdf

        c.  Installation HB w Templates 2013 A PDF-1.pdf

        d.  Installation HB w Templates 2013 B PDF.pdf

        e.  Installation of Screw Actuator, 1 bearing PDF.pdf

        f.   Gearmotor Mounting Instructions A PDF.pdf

        g.  Screw Actuator w Gearmotor 2015.pdf

   2. If OLD existing tower, USE:   

        a.  Installation Instructions 2010--Rebar Leg HB-J.pdf

        b.  Footing HB Type.pdf

        c.  Installation of Foundation Schematic.pdf

        d.  Bolt Configuration Schematic.pdf

        e.  Grounding Rod Schematic.pdf